Proyek Pengaspalan Jalan dan Pembuatan Parit di Desa Balun Ijuk Gang Kost Sahpire – Jalan Jerambah Gantung

Authors

  • Amanda Amanda Universitas Bangka Belitung
  • Octavia Octavia Universitas Bangka Belitung
  • Aqif Abi Aufa Universitas Bangka Belitung
  • Ilham Maulana Universitas Bangka Belitung
  • M.Afdal S Universitas Bangka Belitung

DOI:

https://doi.org/10.61132/jepi.v2i4.1008

Keywords:

Road paving, ditches, financial analysis, NPV, IRR, BCR, Payback Period, infrastructure, Balun Ijuk Village

Abstract

The road paving and ditch construction project in Balun Ijuk Village, particularly from Sahpire Boarding House Lane to Jerambah Gantung Road, aims to enhance transportation infrastructure to support mobility for local residents and students of Bangka Belitung University. This study employs a quantitative method with a financial feasibility analysis approach. Findings indicate that the total project cost is IDR 988,153,778 with an implementation duration of 2 months and 3 weeks. The financial analysis yields a Net Present Value (NPV) of IDR 481,705,602.62 (15%) and IDR 326,419,561.97 (20%), an Internal Rate of Return (IRR) of 18%, a Benefit Cost Ratio (BCR) of 1.48, and a Payback Period (PP) of 2 years and 7 months. Based on these results, the project is deemed economically viable with significant positive impacts on the community, including improved accessibility, reduced flooding risks via effective ditches, and enhanced connectivity and local economic activities. Additionally, the project implementation is expected to create temporary job opportunities and support sustainable infrastructure development in the region.

Downloads

Download data is not yet available.

References

Abuk, Getrudis Maria, and Yusuf Rumbino. "Analisis Kelayakan Ekonomi Menggunakan Metode Net Present Value (NPV), Metode Internal Rate of Return (IRR) Payback Period (PBP) Pada Unit Stone Crusher di CV. X Kab. Kupang Prov. NTT." Jurnal Teknologi 14.2 (2020): 68-75.

Bhattacharyay, B. N. (2009). Infrastructure development for ASEAN economic integration. ADBI Working Paper Series, No. 138. Asian Development Bank Institute.

Calderón, C., & Servén, L. (2014). Infrastructure, growth, and inequality: An overview. World Bank Policy Research Working Paper, No. 7034.

Creswell, J. W. (2014). Research Design: Qualitative, Quantitative, and Mixed Methods Approaches. SAGE Publications.

Creswell, J. W. (2014). Research Design: Qualitative, Quantitative, and Mixed Methods Approaches. SAGE Publications.

Economics, Management, and Financial Markets, 4(3), 100-124.

Esfahani, H. S., & Ramírez, M. T. (2003). Institutions, infrastructure, and economic growth. Journal of Development Economics, 70(2), 443-477.

Friedman, V. J., & Phillips, M. (2004). Dialogues on Work and Practice: The Role of the Evaluator. The Evaluation Exchange.

Friedman, V. J., & Phillips, M. (2004). Dialogues on Work and Practice: The Role of the Evaluator. The Evaluation Exchange.

Hassan, A. (2018). Transportation Infrastructure: The Role of Roads in Economic Development. Journal of Urban Planning.

Inderst, G. (2016). Infrastructure investment, private finance, and institutional investors: Asia from a global perspective. ADBI Working Paper Series, No. 555. Asian Development Bank Institute.

Kerzner, H. (2017). Project Management: A Systems Approach to Planning, Scheduling, and Controlling. Wiley.

kondisi jaringan dan perkerasan jalan di lingkungan kelurahan gilingan surakarta. Jurnal Teknik Sipil dan Arsitektur, 24(1).

Kumar, R., & Kumar, S. (2020). Impact of Road Infrastructure on Economic Growth: A Review. International Journal of Transportation Engineering.

Massie, Takeshi Shimamura, I. Kafrain, and Hence Sandi David Roring. METODE PELAKSANAAN PEKERJAAN PENGASPALAN CAMPURAN ASPAL PANAS AC-BC (ASPHALT CONCRETE BINDER COURSE) Studi Kasus:

Meredith, J. R., & Mantel, S. J. (2012). Project Management: A Managerial Approach. Wiley

Mooy, Merzy, et al. "Analisis Life Cycle Cost dan Kelayakan Investasi pada Bangunan Rumah Tinggal Permanen Tipe 27 m2." Teras Jurnal: Jurnal Teknik Sipil 14.1 (2024): 111-

Nurasiyah, S. (2023). Pembuatan Saluran Drainase Lahan di Kampung Cipulus Desa Bugel Kecamatan Ciawi Kabupaten Tasikmalaya. Lentera Karya Edukasi, 3(3), 141-146.

Paket Preservasi Jalan Poigar-Kaiya- Maelang. Diss. UNIVERSITAS KATOLIK DE LA SALLE MANADO, 2022.

Patton, M. Q. (2008). Utilization-Focused Evaluation. SAGE Publications.

Patton, M. Q. (2008). Utilization-Focused Evaluation. SAGE Publications.

Prasetya, Hestu, Fajar Sri Handayani, and Sugiyarto Sugiyarto. "ANALISIS TEKNIS DAN FINANSIAL PROYEK PEMBANGUNAN APARTEMEN U-RESIDENCE 3 KARAWACI

Project Management Institute (PMI). (2017). A Guide to the Project Management Body of Knowledge (PMBOK® Guide). PMI.

Rogers, P. J. (2014). Theory-Based Evaluation: A Systematic Approach. In The Handbook of Evaluation (pp. 97-116). SAGE Publications.

Rogers, P. J. (2014). Theory-Based Evaluation: A Systematic Approach. In The Handbook of Evaluation (pp. 97-116). SAGE Publications.

Sabara, Laode, and Muh Handy Dwi Adityawan. "Tinjauan Rencana Anggaran Biaya (RAB) Pengaspalan AC-BC Pada Proyek Peningkatan Jalan Budi Utomo Baru Tahun Anggaran 2023." Media Konstruksi: Jurnal Ilmiah Teknik Sipil 9.2 (2024): 151-160.

Saputra, Ardhian, Iwan Nauli Daulay, and Restu Restu. Analisis Penyelesaian Proyek Pengaspalan Jalan Desa (Studi Pada CV. Dita Jaya Lestari Di Kabupaten Kuantan Singingi). Diss. Riau University, 2015.

Sopacua, H. A. I., Mara, J., & Parubak, D. S. (2023). Tinjauan Produktivitas Peralatan Pengaspalan pada Proyek Peningkatan Kapasitas Struktur Jalan Tanah Karaeng- Allu Gowa. Paulus Civil Engineering Journal, 5(4), 597-606.

Syifa Zahra Fajriyah, 2019 IMPLEMENTASI MODEL PEMBELAJARAN BERBASIS PROYEK UNTUK MENINGKATKAN HASIL BELAJAR SISWA PADA MATA PELAJARAN KONSTRUKSI DAN UTILITAS GEDUNG DI SMK NEGERI 3 KUNINGAN

TANGERANG SELATAN." Matriks Teknik Sipil 5.3 (2017).

Torrisi, G. (2009). Public infrastructure: definition, classification and measurement issues.

YUONO, T., & SUNGKONO, K. K. D. (2019). Evaluasi

Zulkarnain, F., & Dewi, I. D. (2020). PKM Pembuatan Saluran Drainase Dusun Ii Jln Inpres Desa Tanjung Gusta Untuk Mengatasi Banjir. JURNAL PRODIKMAS Hasil Pengabdian Kepada Masyarakat, 5(2), 69-73.

Downloads

Published

2024-11-28

How to Cite

Amanda Amanda, Octavia Octavia, Aqif Abi Aufa, Ilham Maulana, & M.Afdal S. (2024). Proyek Pengaspalan Jalan dan Pembuatan Parit di Desa Balun Ijuk Gang Kost Sahpire – Jalan Jerambah Gantung. Jurnal Ekonomi Dan Pembangunan Indonesia, 2(4), 217–232. https://doi.org/10.61132/jepi.v2i4.1008

Similar Articles

<< < 2 3 4 5 6 7 8 > >> 

You may also start an advanced similarity search for this article.